log [2025/06/16 11:01] – [Activities] team2log [2025/06/16 11:31] (current) team2
Line 34: Line 34:
 During the tenth meeting, the team discussed several key updates and developments. The second version of the poster and the first version of the leaflet were reviewed and improved based on previous feedback. Progress was made on the packaging design, focusing on functionality and sustainability. Updated stress tests for the prototype were presented, showing improved results. App development continued steadily, with added features and better usability. Lastly, the structure of the user manual was introduced, outlining the steps users will follow to interact with the system. During the tenth meeting, the team discussed several key updates and developments. The second version of the poster and the first version of the leaflet were reviewed and improved based on previous feedback. Progress was made on the packaging design, focusing on functionality and sustainability. Updated stress tests for the prototype were presented, showing improved results. App development continued steadily, with added features and better usability. Lastly, the structure of the user manual was introduced, outlining the steps users will follow to interact with the system.
 ==== 11th Week Report ==== ==== 11th Week Report ====
 +This week the focus was on finalizing different deliverables.
 +We continued developing the app and made progress on writing the paper.
 +We worked on the packaging and ran a stress simulation.
 +We also started designing the leaflet and organizing the software manual.
 +At the end of the week, we had a meeting to discuss what still needed to be added to the manual.
 +
 +==== 12th Week Report ====
 +This week we prepared and showcased the final prototype.
 +We carried out functional tests to measure key performance metrics.
 +Work continued on the paper to get it ready for submission.
 +We also focused on improving the software manual.
 +A meeting was held to go over everything and plan the final steps.
 +
 +==== 13th Week Report ====
 +This week we worked on preparing the final presentation.
 +We outlined the content and structure, focusing on the key topics.
 +We gathered the results from the functional tests.
 +Time was spent finalizing the paper for submission.
 +We also planned the demo and how it fits into the presentation.
 +
 +==== 14th Week Report ====
 +This week we worked on the final presentation.
 +The problem and motivation slides were completed.
 +We added a slide to show the app interface and its features.
 +A backup video was prepared in case the live demo fails.
 +We also updated the final slide to show a project image instead of a thank-you message.
 +
 +==== 15th Week Report ====
  
 ===== Meetings ===== ===== Meetings =====